©2016 Alpine-Service
Projects 2015
3CLF__002_15
Fxed-grip 3-seater chairlift from the manufacturerLeitner including dismantling
and loading in the Ski Area Kalcheralm/Ratschings (Italien)
technical specifications
rope way type
3-CLF
manufacturer
Leitner
construction year
1993
inclined length
920,00 m
height difference
190,00 m
total pillars
12 n°
direction of rotation
clockwise
diameter conveyor rope
ø 34 mm
transport capacity
1.789 P/H
speed
2,3 meters/Sec.
chair
3 persons
number of vehicles
135 n°
drive system
mountain station
bracing
valley station
drive type
electric
©2016 Alpine-Service
1 SL_005_15
Surface lift system from the manufacturer Doppelmayr including dismantling and
loading in the Ski Area Nassfeld (Österreich)
technical specifications
ropeway type
2-SL
manufacturer
Doppelmayr
construction year
1991
iclined length
1.090,16 m
height difference
332,39 m
total pillars
10 n°
direction of rotation
clockwise
diameter conveyor rope
ø 22 mm
transport capacity
1.220 P/H
speed
3,25 meter/sec.
numberof hangers
122 n°
drive system
valley station
bracing
valley station
drive type
electric
surface lift type
CPF 800 EM
r-Service
1 SL_006_15
Surface lift system from the manufacturer Doppelmayr including dismantling
and loading - Ski Area Nassfeld (Österreich)
technical specifications
ropeway type
2-SL
manufacturer
Doppelmayr
construction year
1981
inclined length
776,14 m
height difference
205,29 m
total pillars
8 n°
direction of rotation
counterclockwise
diameter conveyor rope
ø 22 mm
transport capacity
1.440 P/H
speed
3,25 meter/sec.
number of hangers
105 n°
drive system
valley station
bracing
mountain station
drive type
electric
drive power
132 kW
©2016 Alpine-Service